FIXING

Fixing the system on the property is fast and easy, it takes 10 days to two weeks to finish the job, depending on the size of the project and the amount of details it includes. Our workers and artisans are well trained and experienced, to ensure a professional application to the system and a professional appearance for the finished product.

The system is applied directly to the building blocks/bricks, without the need of plaster coat the wall prior to the application.

In case of a renewal project and the building was painted, the paint layer should be removed.

We ensure that the surface is clean and dry, and free of oil residue so the EPS Boards applied correctly and stay in place as they should. The boards are fixed in place tightly without gaps to prevent cracking.